<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>EPNA, Author at EPNA</title>
	<atom:link href="https://epna.org.nz/author/epna/feed/" rel="self" type="application/rss+xml" />
	<link>https://epna.org.nz/author/epna/</link>
	<description>Eden Park Neighbours&#039; Association</description>
	<lastBuildDate>Mon, 11 Nov 2024 05:25:41 +0000</lastBuildDate>
	<language>en-NZ</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9</generator>

<image>
	<url>https://epna.org.nz/wp-content/uploads/2023/12/epna-logo-150x150.jpg</url>
	<title>EPNA, Author at EPNA</title>
	<link>https://epna.org.nz/author/epna/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Newsflash</title>
		<link>https://epna.org.nz/newsflash/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Thu, 26 Sep 2024 07:16:33 +0000</pubDate>
				<category><![CDATA[Eden Park]]></category>
		<category><![CDATA[EPNA]]></category>
		<category><![CDATA[Issues]]></category>
		<category><![CDATA[Concerts]]></category>
		<category><![CDATA[cricket]]></category>
		<category><![CDATA[sport]]></category>
		<guid isPermaLink="false">https://epna.org.nz/?p=2588</guid>

					<description><![CDATA[<p>Concerts knock cricket out of the park...</p>
<p>The post <a href="https://epna.org.nz/newsflash/">Newsflash</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Travis Scott and Luke Coombs have knocked Auckland Cricket out of the park.</p>



<p>In the midday news on 24 September 2024 Newstalk ZB reported that Auckland Cricket provincial fixtures have not been able to be scheduled at Eden Park because of the Travis Scott and Luke Coombs concerts at the end of October and in January.<br>This will be, as we have said on a number of occasions, the beginning of the end for Auckland Cricket at the park.</p>



<p>And, to top it off, Travis Scott’s concert is on Haloween. We are not sure that Travis Scott and trick or treat are a good mix.</p>
<p>The post <a href="https://epna.org.nz/newsflash/">Newsflash</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Eden Park 12-concert application &#8211; Hearing date set</title>
		<link>https://epna.org.nz/eden-park-12-concert-application-hearing-date-set/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Mon, 16 Sep 2024 09:22:46 +0000</pubDate>
				<category><![CDATA[Eden Park]]></category>
		<category><![CDATA[Issues]]></category>
		<category><![CDATA[amenities]]></category>
		<category><![CDATA[Concerts]]></category>
		<category><![CDATA[Council]]></category>
		<category><![CDATA[Hearing date]]></category>
		<category><![CDATA[reidential]]></category>
		<category><![CDATA[Residents]]></category>
		<guid isPermaLink="false">https://epna.org.nz/?p=2585</guid>

					<description><![CDATA[<p>Eden Park 12-concert application hearing date set...</p>
<p>The post <a href="https://epna.org.nz/eden-park-12-concert-application-hearing-date-set/">Eden Park 12-concert application &#8211; Hearing date set</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Auckland Council have advised that the hearing of Application for Consent by Eden Park for extra concerts will be taking place on 16-18 October with 22 October as an “overflow” day.</p>



<p>This means there is a remarkably short period between the close of submissions and the hearing date. It means that if you want to be heard you will need to prepare your evidence now.</p>



<p>We will be trying to get the Council to postpone the hearing to enable people to prepare properly for the matter and for Council to see what the amenity impacts are on the area before during and after the Cold Play Concerts in November 2024. Those concerts will show clearly the amenity effects of three concerts in quick succession.</p>



<p>We can only assume that the quick turn around of the concert application from submissions to hearing is at the behest of Eden Park to avoid this critical analysis.</p>
<p>The post <a href="https://epna.org.nz/eden-park-12-concert-application-hearing-date-set/">Eden Park 12-concert application &#8211; Hearing date set</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Submissions &#8211; Closing Monday 2nd September</title>
		<link>https://epna.org.nz/submissions-4-days-to-go/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Thu, 29 Aug 2024 21:27:08 +0000</pubDate>
				<category><![CDATA[Eden Park]]></category>
		<category><![CDATA[EPNA]]></category>
		<category><![CDATA[Issues]]></category>
		<category><![CDATA[amenities]]></category>
		<category><![CDATA[Concerts]]></category>
		<category><![CDATA[Mt Eden]]></category>
		<category><![CDATA[Residential]]></category>
		<category><![CDATA[submissions]]></category>
		<guid isPermaLink="false">https://epna.org.nz/?p=2554</guid>

					<description><![CDATA[<p>Submissions - Closing Monday 2nd September...</p>
<p>The post <a href="https://epna.org.nz/submissions-4-days-to-go/">Submissions &#8211; Closing Monday 2nd September</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Reminder – Submissions are due for Eden Park&#8217;s application to increase concert numbers.<br>Submissions close <strong>11:55pm</strong> Monday 2nd September.</p>



<p>Don&#8217;t forget to submit!</p>



<p>Here is the link to the on-line submission again:<br><a href="https://www.aucklandcouncil.govt.nz/have-your-say/have-your-say-notified-resource-consent/notified-resource-consent-applications-open-submissions/Pages/ResourceConsentApplication.aspx?itemId=638&amp;applNum=LUC60434909" target="_blank" rel="noreferrer noopener">https://www.aucklandcouncil.govt.nz/have-your-say/have-your-say-notified-resource-consent/notified-resource-consent-applications-open-submissions/Pages/ResourceConsentApplication.aspx?itemId=638&amp;applNum=LUC60434909</a><br><br>We recommend you read the post &#8220;Eden Park &#8211; Yet another application &#8230;.&#8221; to inform yourself of the true scale of the consent changes applied for. Much more than just the six extra concerts.</p>



<p><br></p>
<p>The post <a href="https://epna.org.nz/submissions-4-days-to-go/">Submissions &#8211; Closing Monday 2nd September</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Eden Park &#8211; Yet another application &#8211; 100% more concerts per year &#8211; UPDATED 30/08</title>
		<link>https://epna.org.nz/eden-park-yet-another-application-100-more-concerts-per-year/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Mon, 26 Aug 2024 22:00:55 +0000</pubDate>
				<category><![CDATA[Eden Park]]></category>
		<category><![CDATA[amenities]]></category>
		<category><![CDATA[Concerts]]></category>
		<category><![CDATA[consent]]></category>
		<category><![CDATA[noise]]></category>
		<category><![CDATA[Residential]]></category>
		<category><![CDATA[variation]]></category>
		<guid isPermaLink="false">https://epna.org.nz/?p=2404</guid>

					<description><![CDATA[<p>This page is updated regularly so check back often...</p>
<p>The post <a href="https://epna.org.nz/eden-park-yet-another-application-100-more-concerts-per-year/">Eden Park &#8211; Yet another application &#8211; 100% more concerts per year &#8211; UPDATED 30/08</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="has-light-green-cyan-to-vivid-green-cyan-gradient-background has-background"><strong><em>Note: This page is updated regularly so check back often.</em></strong><br><br><strong>Click <a href="#Submissions">here </a>for submission information.</strong><br><br><strong>Click or tap: <a href="#SampleSubmission">SAMPLE SUBMISSION ADDED</a></strong></p>



<p>The Eden Park Trust Board is continuing its program of incremental change to its operating consents with a new application for 6 more concerts at the venue allowing it to host 12 concerts annually, up from the current 6.</p>



<p>The application states (with EPNA comments in <em>italics</em> added):</p>



<ul class="wp-block-list">
<li>Consent is sought to hold up to 12 concert events in any calendar year</li>



<li>Those concerts can only be performed by no more than six different artists or acts. <em>EPNA comment: Don’t be fooled by this, as this condition can be easily relaxed &#8211; or removed altogether &#8211; with another variation. <strong>They&#8217;re setting the stage for the next variation.</strong></em></li>



<li><em>EPNA Note: 12 concerts annually is twice the amount Mt Smart or Western Springs have, each with only six High Noise level events per year.</em></li>



<li>Concerts on any weekday and now includes Sundays and public holidays.</li>



<li>Finish times to be extended to 11.00pm, any day of the week (including Sundays)</li>



<li>Increase of concert duration during the week to 5 hours</li>



<li>Later testing/sound check times now 10am &#8211;  8pm any day, with mid-week controls removed for schools, day-care centres, etc. <em>Previously </em> <em>weekday sound checks were only 5pm &#8211; 7pm. This will directly affect those residents who &#8211; for example &#8211; work from home, or the elderly who spend most of their time at home, etc. This is totally unacceptable.</em></li>



<li>60,000 maximum crowd size for a mid-week concert, up from 50,000</li>



<li>Increase from 40dB to 45dB of the pack in/out night-time residential noise limit. <em>40</em> <em>to 45dB is a <strong>50% increase</strong> (every 10dB doubles the noise level</em>)</li>



<li>No maximum night-time peak noise limit during pack-in/pack-out, as previous 75dB LAFmax is removed. <em>Think about it for a moment what this means! A peak sound of 100dB (very loud) could be produced. THIS is what will instantly wake you up at night if you live close. And yet the 45dB average level may never be reached if it&#8217;s relatively quiet for the next 10mins. This is why the average values used are so meaningless and deceptive. It&#8217;s not the averages that are going to wake you up, it&#8217;s the <strong>peaks</strong>!</em></li>



<li>Pack-in and pack-out from concerts can take place all through the night, with unrestricted truck movement in and out of the site <em>(see picture of truck path further below this article). Previously this was limited to 17 heavy vehicles (meaning container trucks with 40-foot containers). Not only that, but forklifts can be used <strong>outside</strong> the stadium throughout the night and steel works be carrier out (both of these were not allowed previously). This is the reason for the 50% increase in residential noise levels. Forget about sleeping with your windows open if living in close proximity of the stadium site. We have direct experience of 40-foot containers being dumped onto the ground in the middle of the night. This &#8211; or similar <strong>peak</strong> noise &#8211; will only increase exponentially with these variations.</em></li>



<li>Sound monitoring will no longer be performed at the property boundary, but only from the mixing desk inside the venue. Boundary noise will then be <strong>calculated</strong> using what is called the Transfer Function. This will apply to both West and East facing stage configurations. <em>So in future, monitoring relies on computer modelling based on past concert measurements. A computer model is only as good as the data that is fed into it (leaving other factors out of consideration). If the data is unreliable or not consistent (each concert is different, in combination with differing environmental/atmospheric conditions), then it becomes almost meaningless.<br>We see this change as an open invitation for concert noise to exceed permitted levels at the property boundaries.</em></li>
</ul>



<div class="wp-block-columns has-light-green-cyan-to-vivid-green-cyan-gradient-background has-background is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<p class="has-light-green-cyan-to-vivid-green-cyan-gradient-background has-background">This downloadable document shows the sheer scale of the consent changes applied for. Much more than just the extra 6 concerts.</p>
</div>



<div class="wp-block-column has-light-green-cyan-to-vivid-green-cyan-gradient-background has-background is-layout-flow wp-block-column-is-layout-flow">
<div class="wp-block-file"><a id="wp-block-file--media-0dce644c-7101-45ac-9713-f2ac8ef4a49d" href="https://epna.org.nz/wp-content/uploads/2024/08/Comparision-new.pdf">Comparision-new</a><a href="https://epna.org.nz/wp-content/uploads/2024/08/Comparision-new.pdf" class="wp-block-file__button wp-element-button" download aria-describedby="wp-block-file--media-0dce644c-7101-45ac-9713-f2ac8ef4a49d">Download</a></div>
</div>
</div>



<p>We said that Eden Park was engaging in this drip feed of variations to the consents it holds and would seek further variations. <strong>We were right.</strong><br>Page 19 of the &#8220;Assessment of Environmental Effects (AEE)&#8221; lists five variations that were granted since the initial resource consent in January 2021. The first non-notified variation already followed two months later in March 2021.</p>



<p>If this application is granted it will see many more cricket games being driven away – both on the main ground and the outer oval with pack in and out, and ground recovery periods. Moving yet further away from the traditional sporting focus.<br><br>This new 100% increase will become the new “base”. Just as Council this year granted an extra concert (to 7) non-notified, a new level of 12 per annum will easily be increased in future given Council’s quality of decision making.</p>



<p>Once again the amenities of our area and not just the “Hood” will be materially affected by the extra concerts- Streets will be locked down for 2-3 evenings, the usual parking issues will multiply, the later finishes will mean the audiences will leave later and the TMP clean-up will last till after midnight in a residential area.</p>



<p>The community around Eden Park is a bit like a frog in a pot of water being brought to the boil. It doesn’t notice the temperature change until it is too late.</p>



<p>Also, on page 24 of the application’s assessment (Assessment of Environmental Effects (AEE) it is noted that in future for most of the 12 concert nights the stage and sound systems will face <strong>East</strong>. Meaning up the slope towards Mt Eden. There are three possible stage configurations, facing West, East or a 360degree stage. From the application, QUOTE:<br><strong><em>5.3 STAGE CONFIGURATIONS</em></strong><br><em>The Concert Consent does not restrict stage location or configuration inside the stadium. Notwithstanding this, the three primary stage locations within the stadium are an East, West or Central stage with differing speaker arrangements and crowd sizes as detailed in Table 5 below.<br>Table 5: Stage Locations and Crowd Size</em></p>



<figure class="wp-block-table"><table class="has-fixed-layout"><tbody><tr><td><strong>Stage Location</strong></td><td><strong>Speaker Arrangements</strong></td><td><strong>Estimated maximum crowd size</strong></td></tr><tr><td>East</td><td>Speakers facing West</td><td>42,000 &#8211; 46,500</td></tr><tr><td>West</td><td>Speakers facing East</td><td>40,000 &#8211; 45,500</td></tr><tr><td>Central</td><td>360 degree speaker arrangement</td><td>58,000 &#8211; 60,000</td></tr></tbody></table></figure>



<p><br><em>Each of these stage locations has been utilised for the concerts held at Eden Park. The planned installation of retractable seating to the Lower West Stand will enhance the configuration of a West stage to provide more optimal sight lines from the North and South Stands and a greater capacity than for an East stage. For these reasons, <strong>a West stage is likely to become the predominant stage location </strong></em>(emphasis EPNA). <br>END QUOTE</p>



<p>Meaning sound systems facing East, <strong>towards Mt Eden</strong>.<br>The 360degree stage was used for the two Ed Sheeran concerts and was an absolute disaster when it came to noise levels in surrounding streets. The bass in particular, with numerous complaints made to EP and Council. It showed how inadequate the current noise levels &amp; controls are, especially the <strong>average</strong> noise levels used, nowhere near the <strong>peak</strong> level. The peak level is what we experience in our houses, or outside for that matter.</p>



<p>Once again, the Marshall Day Acoustics report (Attachment G &#8211; Acoustic Assessment) compares Eden Park with other stadia around New Zealand regarding noise levels, completely ignoring Eden Park&#8217;s residential location, with residential housing in extreme close proximity, unlike any other stadium in NZ (or even world-wide for that matter). There is no comparison and noise levels should be set appropriately. The concerts we&#8217;ve just experienced &#8211; Ed Sheeran in particular &#8211; prove this point. <strong>The existing levels are already unacceptable!</strong> Not to mention the level at which Marshall Day is clutching at straws to try and justify not just the extra concerts, but the removal of monitoring controls. Just read the Acoustic Assessment for your self.</p>



<p>Staying with the AEE, this is what it says on Page 27: &#8220;<em>The Transport Assessment also includes travel mode split for events to Eden Park. The statistics on the public transport usage for arrivals to the concerts shows average 10% of arrivals by bus and average 30% of arrivals by train</em>&#8220;.<br>So, only 40% of patrons use public transport to get to/from the stadium. Using a mid-week crowd size of 60,000 (for which they have applied) means 24,000 will use public transport, a whopping 36,000 won&#8217;t and come predominantly by taxi or car. Think about what that means for a mid-week concert that starts at 6:30pm with patrons arriving during rush hour!</p>



<div class="wp-block-columns has-light-green-cyan-to-vivid-green-cyan-gradient-background has-background is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex">
<figure data-wp-context="{&quot;imageId&quot;:&quot;695f32d1d09b4&quot;}" data-wp-interactive="core/image" data-wp-key="695f32d1d09b4" class="wp-block-image size-large wp-lightbox-container"><img fetchpriority="high" decoding="async" width="1024" height="669" data-wp-class--hide="state.isContentHidden" data-wp-class--show="state.isContentVisible" data-wp-init="callbacks.setButtonStyles" data-wp-on--click="actions.showLightbox" data-wp-on--load="callbacks.setButtonStyles" data-wp-on-window--resize="callbacks.setButtonStyles" data-id="2560" src="https://epna.org.nz/wp-content/uploads/2024/08/truck_path-1024x669.png" alt="truck_path" class="wp-image-2560"/><button
			class="lightbox-trigger"
			type="button"
			aria-haspopup="dialog"
			aria-label="Enlarge"
			data-wp-init="callbacks.initTriggerButton"
			data-wp-on--click="actions.showLightbox"
			data-wp-style--right="state.imageButtonRight"
			data-wp-style--top="state.imageButtonTop"
		>
			<svg xmlns="http://www.w3.org/2000/svg" width="12" height="12" fill="none" viewBox="0 0 12 12">
				<path fill="#fff" d="M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z" />
			</svg>
		</button><figcaption class="wp-element-caption"><strong>Truck path</strong></figcaption></figure>
</figure>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<p class="has-light-green-cyan-to-vivid-green-cyan-gradient-background has-background">Page 26-Figure 3 in the AEE shows the path the trucks will take during pack-in/pack-out, <strong>throughout the night, unrestricted. </strong>This should be of great concern to anyone living in &#8211; or close to &#8211; those streets! Reimers Ave, Sandringham Rd (and its side-streets), Royal Tce, Altham Ave, etc.</p>
</div>
</div>



<p>It is also worth noting that Eden Park is a private stadium, run by a private trust (The Eden Park Trust), not owned or run by Council / Government. Directly taking revenue away from publicly owned stadiums such as Mt Smart. <strong>Any concert hosted at Eden Park, could equally be hosted at Mt Smart or Western Springs (as they always have been), providing much needed income to the city.</strong> All without causing the disruption and discomfort experienced by local EP residents. The concerts to date have been with artists who previously played in Auckland at other council venues such as Mt Smart.</p>



<p>Lastly, it pays to ask yourself: Why should Eden Park be treated so preferably compared to other stadia such as Mt Smart? Looking at EPTB&#8217;s PR spin and track record: What is their End Game?</p>



<h2 class="wp-block-heading" id="Submissions">Submissions</h2>



<p>So if you oppose (or support) the application for consent summarized above make a submission to council on their web site, the details of which are:<br><a href="https://www.aucklandcouncil.govt.nz/have-your-say/have-your-say-notified-resource-consent/notified-resource-consent-applications-open-submissions/Pages/ResourceConsentApplication.aspx?itemId=638&amp;applNum=LUC60434909" target="_blank" rel="noreferrer noopener">https://www.aucklandcouncil.govt.nz/have-your-say/have-your-say-notified-resource-consent/notified-resource-consent-applications-open-submissions/Pages/ResourceConsentApplication.aspx?itemId=638&amp;applNum=LUC60434909</a></p>



<p>Note that submissions close on the <strong>2<sup>nd</sup> of September</strong> so time is short.</p>



<p>Following are some suggestions / guidelines when filing your on-line submission</p>



<ul class="wp-block-list">
<li>Highlight the adverse affects that the doubling of concerts will have on you and your family</li>



<li>This can be concert noise, inability to sleep, inability to work from home due to noise (can&#8217;t concentrate), parking restrictions, road closures, traffic chaos, litter, rowdy patrons, bus and train disruptions, etc.</li>



<li>Loss of amenity such as parking, especially if no ROP (Residents Only Parking) in place such as east of Dominion Rd</li>



<li>The displacement of sporting events, especially cricket with the stadium moving further and further away from its traditional sporting focus</li>



<li>No need to get into too much specific detail as this can be expanded on at the hearing (which we recommend you attend)</li>
</ul>



<p><strong>Submission process</strong></p>



<ul class="wp-block-list">
<li>Click or tap the web link given above, that will take you to the on-line Council submission form</li>



<li>At the top of the page, select the &#8220;Make a submission&#8221; button</li>



<li>Enter your details and select Next</li>



<li>On the following page select &#8220;oppose/support/neutral&#8221;</li>



<li>It then asks which aspects of the application you are submitting on, it&#8217;s easiest just to say &#8220;The application in its entirety&#8221;</li>



<li>Then provide your reasons for the submission. This can be brief, but often it’s better to give some more detail (i.e. noise impact if that is the main concern), so that council planners are aware of the type of effects that concerts currently impose on you, i.e. &#8220;Particular effects I/we’ve faced have been …..&#8221;</li>



<li>Lastly, confirm which decision you would like Council to make, eg &#8220;Decline the application in its entirety&#8221;</li>



<li>Next confirm that you are not a trade competitor</li>



<li>You can upload any supporting documents, i.e. photos, PDF document with more detail, etc</li>



<li>On the next page confirm if you would like to attend the hearing. Always a good idea, you can change later if the hearing date does not suit you</li>



<li>Then submit</li>
</ul>



<p>Don&#8217;t feel apprehensive about attending the hearing. They are usually held at the Town Hall. You turn up at your allotted timeslot and then have your say in front of the hearing panel. The panel may ask you a question or two regarding a comment you have made. Note that the applicant (Eden Park) can not ask you anything.<br>Attending the hearing really adds additional &#8220;oomph&#8221; to your submission.</p>



<h2 class="wp-block-heading" id="SampleSubmission">Sample Submission</h2>



<p>Below is the wording of a submission to the council in opposition to the proposal by Eden Park Trust to add a further 6 concerts to their schedule.&nbsp;Please&nbsp;download and complete it, setting out your own reasons why you feel the consent should not be granted.&nbsp; Once completed submit it to council using the link provided above (attach the file to your submission as outlined above).</p>



<div class="wp-block-file"><a id="wp-block-file--media-d5442e8f-cec2-41a0-b2fb-c1317c864d26" href="https://epna.org.nz/wp-content/uploads/2024/08/generic-opposition-to-concerts.docx">generic opposition to concerts</a><a href="https://epna.org.nz/wp-content/uploads/2024/08/generic-opposition-to-concerts.docx" class="wp-block-file__button wp-element-button" download aria-describedby="wp-block-file--media-d5442e8f-cec2-41a0-b2fb-c1317c864d26">Download</a></div>
<p>The post <a href="https://epna.org.nz/eden-park-yet-another-application-100-more-concerts-per-year/">Eden Park &#8211; Yet another application &#8211; 100% more concerts per year &#8211; UPDATED 30/08</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>August 2024 Newsletter</title>
		<link>https://epna.org.nz/august-2024-newsletter/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Tue, 20 Aug 2024 23:09:17 +0000</pubDate>
				<category><![CDATA[Eden Park]]></category>
		<category><![CDATA[EPNA]]></category>
		<category><![CDATA[Issues]]></category>
		<category><![CDATA[amenities]]></category>
		<category><![CDATA[newsletter]]></category>
		<category><![CDATA[Residential]]></category>
		<guid isPermaLink="false">https://epna.org.nz/?p=2415</guid>

					<description><![CDATA[<p>EPNA August 2024 newsletter posted...</p>
<p>The post <a href="https://epna.org.nz/august-2024-newsletter/">August 2024 Newsletter</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>August 2024 Newsletter posted under the About menu or click <a href="https://epna.org.nz/wp-content/uploads/2024/08/EPNA-Newsletter-August-2024-final.pdf" target="_blank" rel="noreferrer noopener">here</a> to access it.</p>



<p>Contains additional information on the Eden Park 12 concerts application.<br>We also encourage you to read the information under the &#8220;Archive=>Eden Park&#8221; menu which provides information regarding concert noise and concert logistics.</p>



<p>And that the community around Eden Park is not the only one in this situation is illustrated by this article regarding he Santiago Bernabéu stadium in Madrid, Spain. Another traditional sporting stadium (Real Madrid football club) that is now allowed to host concerts.<br><a href="https://www.theguardian.com/world/article/2024/jul/25/madrid-santiago-bernabeu-stadium-deafening-concerts" target="_blank" rel="noreferrer noopener">https://www.theguardian.com/world/article/2024/jul/25/madrid-santiago-bernabeu-stadium-deafening-concerts</a></p>



<p>All very familiar, isn&#8217;t it?</p>
<p>The post <a href="https://epna.org.nz/august-2024-newsletter/">August 2024 Newsletter</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Plan Change 78 &#8211; 1-year extension</title>
		<link>https://epna.org.nz/plan-change-78-1-year-extension/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Tue, 26 Mar 2024 05:59:00 +0000</pubDate>
				<category><![CDATA[Plan Change 78]]></category>
		<category><![CDATA[Auckland Unitary Plan]]></category>
		<category><![CDATA[AUP]]></category>
		<category><![CDATA[intensification]]></category>
		<category><![CDATA[Light Rail Corridor]]></category>
		<guid isPermaLink="false">https://epna.org.nz/?p=2390</guid>

					<description><![CDATA[<p>Last week Minister Chris Bishop, in a speech to the property Council, announced that he has granted a 1yr extension for plan change 78...</p>
<p>The post <a href="https://epna.org.nz/plan-change-78-1-year-extension/">Plan Change 78 &#8211; 1-year extension</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Last week Minister Chris Bishop, in a speech to the property Council, announced that he has granted a 1-year extension for plan change 78.<br>&#8220;<strong><em>I can announce today that I spoke with Mayor Brown on Tuesday and confirmed that his Council may have a further one-year extension for their process, to 31 March 2026.</em></strong><br><strong><em>Auckland is in a unique situation at the moment for two reasons: one is the impact that the Anniversary Weekend floods and Cyclone Gabrielle had on the city in areas that were tagged for intensification. The other is that our Government has scrapped Labour’s failed Auckland Light Rail project meaning Auckland no longer has to take theoretical future light rail stations into account for upzoning decisions, and are therefore having to do some rethinking.”</em></strong></p>



<p>Council will now need to undertake the additional zoning work around the previous LR corridor, and alter the hearing schedules as needed.<br><br><a href="https://www.nzherald.co.nz/nz/housing-minister-chris-bishop-grants-auckland-council-one-year-extension-to-work-on-new-intensification-rules/ITBUOXY4NZF25JIAEHUWQ4QDKY/" target="_blank" rel="noreferrer noopener">https://www.nzherald.co.nz/nz/housing-minister-chris-bishop-grants-auckland-council-one-year-extension-to-work-on-new-intensification-rules/ITBUOXY4NZF25JIAEHUWQ4QDKY/</a><br><br></p>
<p>The post <a href="https://epna.org.nz/plan-change-78-1-year-extension/">Plan Change 78 &#8211; 1-year extension</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Auckland Unitary Plan &#8211; Plan Change 78</title>
		<link>https://epna.org.nz/unitary-plan-plan-change78-update-mar2024/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Mon, 18 Mar 2024 00:04:57 +0000</pubDate>
				<category><![CDATA[Plan Change 78]]></category>
		<category><![CDATA[Auckland Unitary Plan]]></category>
		<category><![CDATA[AUP]]></category>
		<category><![CDATA[intensification]]></category>
		<guid isPermaLink="false">https://epna.org.nz/?p=2376</guid>

					<description><![CDATA[<p>The government has indicated the city-wide intensification 3 storey zones ie MDRS (Medium Density Residential Standards), will not be compulsory for councils if they have adequate growth zoned already.</p>
<p>The post <a href="https://epna.org.nz/unitary-plan-plan-change78-update-mar2024/">Auckland Unitary Plan &#8211; Plan Change 78</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>The government has indicated the city-wide intensification 3 storey zones ie MDRS (Medium Density Residential Standards), will not be compulsory for councils if they have adequate growth zoned already.<br>However, there is confusion, as this legislation has not been finalised, while the hearing Panel for Plan Change 78 is currently continuing. Council has urgently requested the ability to put the hearing process on hold.<br>More information here: <a href="https://www.nzherald.co.nz/nz/auckland-mayor-wayne-brown-calls-on-housing-minister-chris-bishop-to-stop-dopey-mandate-on-intensification-hearings/MHLCMHEVZ5HYLPT6WHONSWRV4M/" target="_blank" rel="noreferrer noopener">https://www.nzherald.co.nz/nz/auckland-mayor-wayne-brown-calls-on-housing-minister-chris-bishop-to-stop-dopey-mandate-on-intensification-hearings/MHLCMHEVZ5HYLPT6WHONSWRV4M/</a></p>



<p>For this area, this is extremely important as there was no proposed specific zoning for people to submit on, as the area along the Light Rail corridor was excluded by Council.<br>With the government now canceling that project, it’s unclear what zoning may be applied around here, and whether changes can be snuck through under the current plan change, as many submissions wanting greater intensification ignored the fact the light rail corridor was out of the scope of the plan change, and requested much greater intensification be provided.<br>Another media summary of the issue: <a href="https://newsroom.co.nz/2024/03/13/unfair-and-prejudicial-council-and-residents-want-housing-hearings-postponed/" target="_blank" rel="noreferrer noopener">https://newsroom.co.nz/2024/03/13/unfair-and-prejudicial-council-and-residents-want-housing-hearings-postponed/</a></p>



<p>We will update as soon as we have further information.</p>



<p></p>
<p>The post <a href="https://epna.org.nz/unitary-plan-plan-change78-update-mar2024/">Auckland Unitary Plan &#8211; Plan Change 78</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Eden Park &#8211; Concerts variation</title>
		<link>https://epna.org.nz/eden-park-to-apply-for-12-concerts/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Tue, 05 Mar 2024 02:22:47 +0000</pubDate>
				<category><![CDATA[Eden Park]]></category>
		<category><![CDATA[amenities]]></category>
		<category><![CDATA[Concerts]]></category>
		<category><![CDATA[Residential]]></category>
		<guid isPermaLink="false">https://epna.iction.co.nz/?p=2141</guid>

					<description><![CDATA[<p>A consent variation was approved by Council in December 2023 which now allows Eden Park to host 6 concerts in a calendar year...</p>
<p>The post <a href="https://epna.org.nz/eden-park-to-apply-for-12-concerts/">Eden Park &#8211; Concerts variation</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Another “variation” in a string of variations that we’ve seen since EPTB gained concert consent approval in early 2021.<br>A consent variation was approved by Council in December 2023 which now allows Eden Park to host 6 concerts in a calendar year rather than 6 concerts over a 12-month period. Note that this application was processed on a non-notified basis, so the public was unable to submit any feedback.<br>Six concerts in a calendar year allows the EPTB to host more concerts during the summer period (November – March), causing additional impacts for local residents just when outdoor living and activity is at its peak.<br>Council-owned Mt Smart and Western Springs stadia have consent approval to host 6 concerts (called High Special Noise Events) over a 12-month period, not a calendar year which potentially puts both at a dis-advantage when it comes to hosting concerts over the busy summer period.</p>



<p>Here’s a break-down of the conditions for Western Springs and Mt Smart.<br>BTW, the same applies to North Harbour stadium.</p>



<figure class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex">
<figure data-wp-context="{&quot;imageId&quot;:&quot;695f32d1d5520&quot;}" data-wp-interactive="core/image" data-wp-key="695f32d1d5520" class="wp-block-image size-large is-style-default wp-lightbox-container"><img decoding="async" width="725" height="878" data-wp-class--hide="state.isContentHidden" data-wp-class--show="state.isContentVisible" data-wp-init="callbacks.setButtonStyles" data-wp-on--click="actions.showLightbox" data-wp-on--load="callbacks.setButtonStyles" data-wp-on-window--resize="callbacks.setButtonStyles" data-id="2202" src="https://epna.org.nz/wp-content/uploads/2024/03/WesternSpringsConditions.png" alt="Western Springs conditions" class="wp-image-2202" srcset="https://epna.org.nz/wp-content/uploads/2024/03/WesternSpringsConditions.png 725w, https://epna.org.nz/wp-content/uploads/2024/03/WesternSpringsConditions-248x300.png 248w" sizes="(max-width: 725px) 100vw, 725px" /><button
			class="lightbox-trigger"
			type="button"
			aria-haspopup="dialog"
			aria-label="Enlarge"
			data-wp-init="callbacks.initTriggerButton"
			data-wp-on--click="actions.showLightbox"
			data-wp-style--right="state.imageButtonRight"
			data-wp-style--top="state.imageButtonTop"
		>
			<svg xmlns="http://www.w3.org/2000/svg" width="12" height="12" fill="none" viewBox="0 0 12 12">
				<path fill="#fff" d="M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z" />
			</svg>
		</button><figcaption class="wp-element-caption"><strong>Western Springs conditions</strong></figcaption></figure>



<figure data-wp-context="{&quot;imageId&quot;:&quot;695f32d1d5bfa&quot;}" data-wp-interactive="core/image" data-wp-key="695f32d1d5bfa" class="wp-block-image size-large wp-lightbox-container"><img decoding="async" width="522" height="548" data-wp-class--hide="state.isContentHidden" data-wp-class--show="state.isContentVisible" data-wp-init="callbacks.setButtonStyles" data-wp-on--click="actions.showLightbox" data-wp-on--load="callbacks.setButtonStyles" data-wp-on-window--resize="callbacks.setButtonStyles" data-id="2206" src="https://epna.org.nz/wp-content/uploads/2024/03/MtSmartConditions.png" alt="Mt Smart conditions" class="wp-image-2206" srcset="https://epna.org.nz/wp-content/uploads/2024/03/MtSmartConditions.png 522w, https://epna.org.nz/wp-content/uploads/2024/03/MtSmartConditions-286x300.png 286w" sizes="(max-width: 522px) 100vw, 522px" /><button
			class="lightbox-trigger"
			type="button"
			aria-haspopup="dialog"
			aria-label="Enlarge"
			data-wp-init="callbacks.initTriggerButton"
			data-wp-on--click="actions.showLightbox"
			data-wp-style--right="state.imageButtonRight"
			data-wp-style--top="state.imageButtonTop"
		>
			<svg xmlns="http://www.w3.org/2000/svg" width="12" height="12" fill="none" viewBox="0 0 12 12">
				<path fill="#fff" d="M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z" />
			</svg>
		</button><figcaption class="wp-element-caption"><strong>Mt Smart conditions</strong></figcaption></figure>
</figure>



<p>Question is: Why should Eden Park – the stadium in the worst position for this type of event – be treated so preferably? Where is the rational?</p>



<hr class="wp-block-separator has-alpha-channel-opacity is-style-wide"/>
<p>The post <a href="https://epna.org.nz/eden-park-to-apply-for-12-concerts/">Eden Park &#8211; Concerts variation</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Website Update</title>
		<link>https://epna.org.nz/website-update/</link>
		
		<dc:creator><![CDATA[EPNA]]></dc:creator>
		<pubDate>Mon, 11 Dec 2023 08:16:53 +0000</pubDate>
				<category><![CDATA[EPNA]]></category>
		<category><![CDATA[amenities]]></category>
		<category><![CDATA[Heritage]]></category>
		<category><![CDATA[Mt Eden]]></category>
		<category><![CDATA[Residential]]></category>
		<guid isPermaLink="false">https://192.168.122.65/?p=1971</guid>

					<description><![CDATA[<p>The EPNA website has been updated and re-designed...</p>
<p>The post <a href="https://epna.org.nz/website-update/">Website Update</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p> </p>



<span id="more-1971"></span>



<p>The EPNA website has been updated and re-designed to give it a more modern look and make it compatible with modern devices such as tablets and mobile phones. Old content has been preserved as much as possible and can be found under the Archive and About menu options.</p>



<p>With your support, EPNA will continue to protect the character and amenities of this heritage residential neighbourhood.</p>
<p>The post <a href="https://epna.org.nz/website-update/">Website Update</a> appeared first on <a href="https://epna.org.nz">EPNA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
